Palm Tree Community
FAQ Members List Calendar New Posts Register
Go Back   Palm Tree Community > Palmhugger News & Reviews > Real Palm Trees - News and Reviews

Real Palm Trees - News and Reviews Palmhugger News

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old October 11th, 2017, 09:20 AM
Palmhugger News's Avatar
RPT Green Thumb
 
Join Date: Sep 2016
Location: Real Palm Trees - Reviews & News
Posts: 108
Post Baker Electric Solar Brings Solar Energy and Cost Savings to Ferring Research Institute


Baker Electric Solar has designed and installed a 95.04 kW solar system for San Diego-based Ferring Research Institute.

SAN DIEGO, CA
OCTOBER 11, 2017

Baker Electric Commercial Solar Group, a full-service solar company that designs and installs technologically advanced solar and energy storage systems in San Diego, recently completed a solar system for Ferring Research Institute Inc. (FRI). The 95.04 kW rooftop system will save the research facility an estimated $27,207 in energy costs over the first year of its installation. FRI is located at 4245 Sorrento Valley Blvd. in San Diego, California.


FRI is the flagship research center for Ferring Pharmaceuticals. Since 1996, FRI scientists have been focused on the development of advanced therapeutic peptides and proteins in key therapeutic areas including reproductive health, urology and gastroenterology. FRI’s vision is to build a portfolio of novel, innovative peptide therapeutics addressing areas of high unmet medical needs across the world.

“At Ferring we are committed to being a socially and environmentally responsible member of the communities in which we operate” said Keith James President FRI & SVP Research at Ferring. “We are very pleased to have partnered with Baker Electric in the installation of this solar system, which is an important step in minimizing our environmental footprint, and significantly improving the energy efficiency of our facility here in San Diego.”

“The Ferring Research Institute’s solar project is in direct alignment with its commitment to fiscal responsibility and corporate stewardship,” said Baker’s Vice President of Commercial Solar and Safety, Scott Williams. “Over the 25-year warranted life of its solar system, Ferring will benefit from more than $565,000 in energy cost savings. We’re gratified that these funds will be re-invested to further support the institute’s important pharmaceutical research.”

According to the EPA Greenhouse Gas Equivalencies Calculator, Ferring Research Institute’s new solar system will save the equivalent of annual greenhouse gas emissions from 213,564 miles driven by an average passenger vehicle. It will offset CO2 emissions from 10,027 gallons of gasoline consumed or 95,088 pounds of coal burned.
For more information on Baker Electric Commercial Solar, visit Commercial Solar Energy Systems | Baker Electric San Diego

About Ferring Research Institute Inc.
Located in San Diego, California Ferring Research Institute Inc. (FRI) is the global peptide therapeutics research center for Ferring Pharmaceuticals. FRI is committed to building a portfolio of novel, innovative peptide-based drugs and biologicals to address the high unmet medical need for patients in our therapeutic areas of interest. For more detailed information please visit Therapeutic, Pharmaceutical, Reproductive Health, Urology, Peptide | Ferring Pharmaceuticals.

About Baker Electric Commercial Solar
The San Diego based Baker Electric Commercial Solar Group designs, installs and maintains solar and energy storage systems for commercial facilities and utility-scale projects across Southern and Central California. Solar Power World’s 2017 Top 500 Solar Contractor report listed Baker No. 1 Electrical Subcontractor and No. 9 on the Top 500 Solar Contractors in the U.S. Baker has been in business since 1938 and is a 4th generation privately held company. For more information, visit Commercial Solar Energy Systems | Baker Electric San Diego.


Contact Author
SUSAN ALMON-PESCH
Baker Electric Commercial Solar
+1 (858) 205-0516
__________________
Real Palm Trees News & Reviews - Please feel free to comment or post about the relevant subject. All rights are reserved and pertain to authors, writers, and/or collaborators.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!Reddit!
Reply With Quote
  #2 (permalink)  
Old June 26th, 2018, 10:18 PM
RPT Newbie
 
Join Date: Jun 2018
Posts: 2
Default

Baker Electric Commercial Solar Group, a full-service sun employer that designs and installs technologically superior solar and strength garage structures in San Diego, lately finished a sun system for Ferring Research Institute Inc. (FRI). The ninety five.04 kW rooftop device will store the studies facility an envisioned $27,207 in power expenses over the primary year of its installation. FRI is placed at 4245 Sorrento Valley Blvd. In San Diego, California.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!Reddit!
Reply With Quote
Reply

Bookmarks

Tags
epa greenhouse, greening the world, solar power

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

All times are GMT -5. The time now is 07:09 PM.